
ADU Builder in Colorado Springs
Attached ADUs, detached DADUs and garage conversions designed around the city’s 2025 ADU rules.
Accessory dwelling units, built start to finish
An accessory dwelling unit (ADU) can house family, provide long-term rental income, or create a private guest suite. Colorado Springs updated its ADU rules in 2025 to allow one ADU on qualifying single-family lots, and Colorado’s HB24-1152 pushed larger cities statewide to allow them.
Benson Contracting builds attached ADUs, detached ADUs (DADUs), above-garage units and garage conversions. We start with a feasibility check of your lot — size limits, setbacks, height, parking and overlays — before you spend money on full plans.
Our ADU process
- Lot feasibility review and budget range
- Design and 3D model coordination
- Engineering and permit submittal through PPRBD
- Utilities, foundation and framing
- Interior finish, kitchen and bath
- Final inspection and certificate of occupancy
Colorado Springs ADU rules at a glance
Summary of the city’s 2025 ADU ordinance. Always confirm your lot before designing.
| Number allowed | One ADU per single-family lot |
|---|---|
| Maximum size | The lesser of 50% of the primary home or 1,250 sq ft (750 sq ft if the home is under 1,500 sq ft) |
| Detached ADU height | 16 ft (garage conversions up to 25 ft) |
| Rear setback (detached) | 5 ft |
| Parking | One off-street space |
| Short-term rental | Not allowed |
| Wildfire overlay | Attached and detached ADUs not allowed in the WUI-O overlay |
Source: City of Colorado Springs ADU page and ADU Ordinance Update. Read our full ADU rules guide.
ADUs & DADUs projects
A selection of past work. Click any photo to view it full size.
How your project runs
Call or request an estimate
Tell us about the project. We will ask about scope, timing and budget so the site visit is productive.
Site visit & walkthrough
Donovan meets you on site, measures, checks existing conditions and talks through options.
Written, line-item proposal
You get a clear scope and price. Design, engineering and permit needs are identified up front.
Permits & scheduling
We pull the permits our license covers and schedule inspections with the building department.
Build
Our own crew handles framing, tile and finish carpentry. You get regular updates from the person running the job.
Final walkthrough
We walk the finished work with you, close out inspections and make sure every detail is right.
ADUs & DADUs FAQ
Can I build an ADU in Colorado Springs?
How big can an ADU be?
Can I rent out my ADU on Airbnb?
Who issues ADU permits?
Ready to build your custom home?
Free consultations for custom homes and new construction — plus remodels, additions and ADUs — from Woodland Park and Colorado Springs through Douglas County to Denver.
Mon–Fri, 7:00 am – 7:00 pm · donovan@bensoncontractingllc.com






