Custom Homes · New Construction · Remodeling — Colorado Springs, Douglas County & Denverdonovan@bensoncontractingllc.com
Wall and roof framing on a new home

Cost to Build a Custom Home in Colorado Springs (2026)

Real 2026 cost-per-square-foot ranges, utility and permit fees, well and septic costs and example budgets — from a local custom home builder, with sources.

Short answer

In 2026, most custom homes in the Colorado Springs area cost roughly $300 to $550+ per square foot to build, before land. A home with a main level over a finished basement usually lands at the low end; a single-level ranch, complex roof, lots of glass or luxury finishes push it higher. On top of construction, plan for site and utility costs: about $11,000–$21,000 in Colorado Springs Utilities development charges for a lot inside city limits (50% more outside), or roughly $50,000+ for a well and septic system on acreage, plus permits, design and engineering.

Updated November 2026 · By Donovan Benson, owner of Benson Contracting LLC

“What does it cost per square foot?” is the first question almost every custom home client asks. Here is an honest answer for Colorado Springs, El Paso County and Douglas County, with the published numbers behind it and the costs that per-square-foot figures leave out.

Cost per square foot: what the numbers say

BenchmarkCost per sq ftWhat it covers
National median, contractor-built home on owner’s land (2025)$171.57 (U.S. Census)Contract price only; excludes lot. Mostly standard homes, not high-end custom.
West region median (2025)$176.87 (U.S. Census)Same measure, western states.
National average construction cost, homes built for sale (2024)about $162 (NAHB)Construction cost only, 2,647 sq ft average home.
Colorado Springs custom: main level over finished basement (2026)$300–$325 (local builder data)Design, permitting, garage and construction; land, well, septic and landscaping separate.
Colorado Springs custom: single level (2026)$400–$440 (local builder data)Same basis; more foundation and roof per finished foot.
Colorado Springs fully custom / luxury (2026)$375–$550+ (local builder data)Construction only; land, utilities, site work, design and landscaping separate.

The national figures are useful as a floor, not a quote. They are dominated by standard-spec homes on easy lots. A true custom home on the Front Range typically carries engineered foundations for expansive soils, more structure, better windows and higher finish levels.

Why basements lower the cost per foot

A finished basement adds square footage under the same roof and over the same foundation footprint, so the expensive parts of the house are spread over more area. That is why main-over-basement homes price lower per square foot than single-level ranches of the same total size, even though the ranch may cost less overall.

Where the money goes

NAHB’s 2024 survey of builders breaks a typical new home’s construction cost into these shares (NAHB):

StageShare of construction cost
Site work (permits, impact, water and sewer fees, design)7.6%
Foundation (excavation, concrete, backfill)10.5%
Framing (including trusses and sheathing)16.6%
Exterior finishes (siding, roofing, windows, doors)13.4%
Mechanical rough-ins (plumbing, electrical, HVAC)19.2%
Interior finishes (insulation through fixtures)24.1%
Final steps (landscaping, driveway, decks, cleanup)6.5%
Other2.1%

In custom homes, interior finishes usually take a bigger share than that national average because that is where clients spend: cabinetry, tile, trim, lighting and appliances.

Costs that per-square-foot numbers leave out

Utility connections inside Colorado Springs

Colorado Springs Utilities charges development charges based on lot size when a new home connects to water and wastewater (CSU 2025 Development Charges):

Charge (3/4″ meter, inside city)5,000–6,999 sq ft lot15,000+ sq ft lot
Water Development Charge$7,243$10,949
Water Resource Fee$5,260$7,952
Wastewater Development Charge$1,868$1,868
Water tap permit, service line inspection and wastewater permit$845$845
Total$15,216$21,614

CSU charges are 50% higher outside city limits (CSU). Electric and gas line extensions are billed separately.

Well and septic on acreage

In Black Forest, Franktown, Elbert County edges and much of rural Douglas County, you drill a well and install a septic (OWTS) system instead of paying taps. A Colorado Springs-area builder suggests budgeting about $25,000 each as a placeholder until well depth and soils are known (local builder data); deep wells, poor soils or engineered septic systems can run well above that. Well permits come from the Colorado Division of Water Resources. In El Paso County, a new OWTS permit from Public Health is $961 (EPCPH fee schedule). In unincorporated Douglas County, you must show a well test of at least one gallon per minute before a building permit is issued, or add a cistern (Douglas County).

Permits and plan review

In the Pikes Peak region, building permits are issued by PPRBD. In unincorporated Douglas County there is no flat fee: the permit is based on a valuation from the home’s square footage, plan review adds 30–65% of the permit fee, use tax is 1% of half the valuation, and there is a $120 wildfire mitigation fee plus $40 for a driveway permit where applicable (Douglas County). Towns such as Castle Rock and Parker add their own system development or excise fees.

Site work

Lot clearing, long driveways, rock excavation, retaining walls, drainage, utility trenching and over-excavation for expansive soils are lot-specific and can swing a budget by tens of thousands of dollars. This is why we do a feasibility review before design is finished.

Design and engineering

Architectural plans, structural engineering, a soils report and an engineered foundation design. Douglas County requires a PE-stamped soils report and engineered foundation for new homes. See our custom home build guide for the full requirements.

Example budget: 3,200 sq ft home on a city lot

An illustrative example, not a quote, for a main level over a finished basement on a 15,000+ sq ft lot inside Colorado Springs:

ItemBudget range
Construction, 3,200 sq ft at $300–$350/sq ft$960,000–$1,120,000
CSU water and wastewater development charges and permitsabout $21,600
Electric and gas extensions, site work, drivewaylot-specific
Landscaping and window coveringsoften separate
Landseparate

Example budget: acreage with well and septic

On a rural lot, swap the CSU charges for a well and septic system (about $50,000+ combined as a starting placeholder), and add power extension, propane, clearing and a longer driveway as the lot requires.

What drives your number up or down

  • Layout: single level vs. main over basement vs. two story.
  • Size: smaller homes cost more per foot because kitchens and baths don’t shrink.
  • Roof and structure: complex roof lines, vaulted ceilings, steel beams and large spans.
  • Glass: window count, size and performance.
  • Finishes: cabinetry, tile, flooring, trim, lighting and appliance level.
  • Lot: slope, soils, rock, access, wildfire code and utilities.

How Benson Contracting prices a custom home

We don’t quote a single per-square-foot number, because two homes with the same square footage can price very differently. Instead, we start with your lot and plans and build a line-item budget with allowances spelled out, so you can see exactly where each dollar goes and where you can adjust. Owner Donovan Benson prices every job himself, and our own crew handles framing, tile and finish carpentry.

Request a custom home estimate or call (425) 351-3029.

Figures are published 2024–2026 data for general budgeting only, not a quote. Fees change; confirm current amounts with each agency for your address.

Custom home cost FAQ

How much does it cost per square foot to build a custom home in Colorado Springs?
In 2026, published figures from local builders put custom homes at roughly $300–$325 per square foot for a main level over a finished basement, about $400–$440 for a single-level home, and $375–$550+ for fully custom or luxury builds, before land.
Does the cost per square foot include land?
No. Per-square-foot figures normally exclude land and often exclude well, septic, utility development charges, site work, landscaping and design. Always ask a builder what is included.
How much are water and sewer tap fees in Colorado Springs?
For a single-family home inside city limits with a 3/4-inch meter, Colorado Springs Utilities development charges and permits total about $15,200 on a 5,000–6,999 sq ft lot and about $21,600 on a lot of 15,000 sq ft or more, based on its 2025 schedule. Charges are 50% higher outside city limits.
How much does a well and septic system cost near Colorado Springs?
A common budgeting placeholder is about $25,000 each, but deep wells, poor soils or engineered septic designs can cost more. A new septic (OWTS) permit from El Paso County Public Health is $961.
Is it cheaper to build a house or buy one in Colorado Springs?
It depends on the lot and finish level. Building gives you a home designed for your lot and needs, but a fully custom home usually costs more per square foot than an existing or production home. A feasibility review and line-item budget give you a real number to compare.
How do I get an accurate price for my custom home?
Share your lot address and any plans or ideas. Benson Contracting reviews feasibility and site costs, then builds a line-item budget with allowances. Call (425) 351-3029.

Homes we build, from the ground up

Ready to build your custom home?

Free consultations for custom homes and new construction — plus remodels, additions and ADUs — from Woodland Park and Colorado Springs through Douglas County to Denver.

Mon–Fri, 7:00 am – 7:00 pm · donovan@bensoncontractingllc.com

Call (425) 351-3029Free Estimate