Custom Homes · New Construction · Remodeling — Colorado Springs, Douglas County & Denverdonovan@bensoncontractingllc.com
3D design model of a detached ADU

ADU Builder in Colorado Springs

Attached ADUs, detached DADUs and garage conversions designed around the city’s 2025 ADU rules.

Accessory dwelling units, built start to finish

An accessory dwelling unit (ADU) can house family, provide long-term rental income, or create a private guest suite. Colorado Springs updated its ADU rules in 2025 to allow one ADU on qualifying single-family lots, and Colorado’s HB24-1152 pushed larger cities statewide to allow them.

Benson Contracting builds attached ADUs, detached ADUs (DADUs), above-garage units and garage conversions. We start with a feasibility check of your lot — size limits, setbacks, height, parking and overlays — before you spend money on full plans.

Our ADU process

  1. Lot feasibility review and budget range
  2. Design and 3D model coordination
  3. Engineering and permit submittal through PPRBD
  4. Utilities, foundation and framing
  5. Interior finish, kitchen and bath
  6. Final inspection and certificate of occupancy

Colorado Springs ADU rules at a glance

Summary of the city’s 2025 ADU ordinance. Always confirm your lot before designing.

Number allowedOne ADU per single-family lot
Maximum sizeThe lesser of 50% of the primary home or 1,250 sq ft (750 sq ft if the home is under 1,500 sq ft)
Detached ADU height16 ft (garage conversions up to 25 ft)
Rear setback (detached)5 ft
ParkingOne off-street space
Short-term rentalNot allowed
Wildfire overlayAttached and detached ADUs not allowed in the WUI-O overlay

Source: City of Colorado Springs ADU page and ADU Ordinance Update. Read our full ADU rules guide.

ADUs & DADUs projects

A selection of past work. Click any photo to view it full size.

How your project runs

  1. Call or request an estimate

    Tell us about the project. We will ask about scope, timing and budget so the site visit is productive.

  2. Site visit & walkthrough

    Donovan meets you on site, measures, checks existing conditions and talks through options.

  3. Written, line-item proposal

    You get a clear scope and price. Design, engineering and permit needs are identified up front.

  4. Permits & scheduling

    We pull the permits our license covers and schedule inspections with the building department.

  5. Build

    Our own crew handles framing, tile and finish carpentry. You get regular updates from the person running the job.

  6. Final walkthrough

    We walk the finished work with you, close out inspections and make sure every detail is right.

ADUs & DADUs FAQ

Can I build an ADU in Colorado Springs?
Most single-family lots can have one ADU under the 2025 ordinance, subject to size, setback, height, parking and overlay limits. Lots in the WUI-O wildfire overlay cannot add attached or detached ADUs.
How big can an ADU be?
The lesser of 50% of the primary home’s floor area or 1,250 sq ft. If the primary home is under 1,500 sq ft, the limit is 750 sq ft.
Can I rent out my ADU on Airbnb?
No. Colorado Springs does not allow ADUs to be used as short-term rentals. Long-term rental is permitted.
Who issues ADU permits?
In Colorado Springs, ADU building permits go through the Pikes Peak Regional Building Department after city zoning review.

Ready to build your custom home?

Free consultations for custom homes and new construction — plus remodels, additions and ADUs — from Woodland Park and Colorado Springs through Douglas County to Denver.

Mon–Fri, 7:00 am – 7:00 pm · donovan@bensoncontractingllc.com

Call (425) 351-3029Free Estimate